system or for OEM piping assemblies.
This key collaborative planning
provides a solid foundation for
subsequent design work, as well as
for fabrication of piping assemblies
at a CPS center or on site.
As the project enters the design
stage, Parker’s engineer-to-engineer
collaboration with the customer
ensures that all technical requirements
are met. Depending on the scope of
work, piping assemblies are designed
either on the jobsite or at the CPS
center. Our piping designers are
experts in on-site measurement/
surveying, development or modifica-
tion of detailed piping drawings,
and steadfast review of customer
technical specifications and applicable
standards.
Prefabricated Assemblies
and Installations
Parker’s CPS teammigrates the upfront
piping engineering to factory prefab-
ricated pipe assemblies with several
installation options.
With state-of-the-art CNC large- and
small-capacity bending equipment,
as well as all complementary pipe end
finishing equipment, the CPS team
expertly manufactures prefabricated
piping assemblies.
By using cold drawn seamless tubes,
the non-welded Parflange F37 system
is inherently cleaner than welded
piping systems, providing the benefit of
reduced system flushing time. The CPS
center employs Parker filtration and
condition monitoring technologies to
bring piping cleanliness to document-
ed customer requirements. On-site
leak-proof testing services can also be
specified.
Parker delivers fabricated pipe
assemblies to the worksite. These
pipe assemblies will be protected,
labeled and ready for installation by
the customer or Parker.
With the largest CNC cold bending
capabilities in the industry, Parker’s
CPS team specializes in the factory
fabrication of pre-bent piping assem-
blies. These assemblies reduce much
of the on-site design and fabrication
and allow for the most efficient instal-
lation on the jobsite. When the project
does not allow for prefabrication of
assemblies, Parker’s CPS technicians
dispatch these capabilities to the job.
Parker is fully engaged in the on-site
installation of piping assemblies.
A Parker CPS project manager leads
the team of trained installers to
maximize installation throughput and
quality of installation work. Parker’s
lead role in overseeing the project from
start to finish, and in ensuring that
the installed piping systemmeets all
requirements, instills a high degree
of customer confidence.
The on-site piping installation
service also enables quick reaction to
unforeseen project obstacles or design
changes. Costly project delays and
downtime are dramatically minimized.
Parker provides best-in-class
non-welded piping systems. Whether
the scope of the project requires the
complete redesign of a welded piping
system or the fabrication and delivery
of a pre-engineered non-welded piping
assembly, Parker CPS will engineer
a solution to maximize customer value.
Application Specific Piping Solutions
Some projects may require significant consultation and design services, while others may only need
prefabricated pipe assemblies from a customer supplied print. Customers have the ability to choose from
the breadth of services provided through the Parker CPS center – whether this is prefabricated piping assem-
blies delivered to the jobsite, on-site piping fabrication or a more turnkey approach including installation.
Flare Flange
Retaining Ring
Light Duty
Robust technology is the foundation
of Parker Complete Piping Solutions
(
CPS). Parflange F37 non-welded
piping systems utilize standard SAE
Code 61/62, ISO 6162 and ISO 6164
flange interfaces. Parflange F37 is
fully complemented with Parker’s
fabrication equipment and a broad
range of interconnect components,
valves, clamps and seamless tubes.